Sunday, February 20, 2011

Photo of the Day - January


Since last year, I've taken a photo every day to document the mundane and everyday of our lives.  There were weeks where I might not have gotten a photo each day, but during the week there were enough photos to fill seven days.  Some are funny and some are a true documentation of daily life.  Here's a look at January































Saturday, February 19, 2011

House Renovation, Day 6


After we got G back to town we went to the house to check on Zak Brown's progress.  He spent the day laying the planks in our room so he can sand, stain and seal the floors on Monday.  Don't be alarmed by the photo below.
Love the zebra stripes?
Zak Brown wanted to mix some of the planks that were in our room before the remodel with new planks.  That will give a more cohesive look to the room.  Hence the zebra stripes.  On Monday that will no longer be a problem.

G saw that it was dirty and started to clean up.  
Keep up the great work, kid!
The house still had the lovely urethane smell, so we had the right idea to stay at the hotel for one more night.  We did stop at the hardware store to get some odor removing gel packs for the house.  We hope they work because we're coming home tomorrow.  We zipped back to the hotel for a little swim.  While I had the greatest of intentions of swimming, I actually forgot to pack my suit in the craziness of last night's packing.  Oh well, I sat in the sunshine by the window while Matt and the kids had fun.


The Boy Is Back In Town

We are back to a family of four. I picked G up from Grandma and Grandpa's this morning. It was just the welcome I hoped for. When I walked in he got a huge smile on his face then went back to the living room to do a little show-off dance. Then he made a beeline for the closet and grabbed his coat. We are so thankful to Matt's parents for keeping G while the house was turned upside down.

The urethane will be dry enough to put the kids' rooms back together. Ha! Kids' rooms - as in more than one! I'm sure G is ready to sleep in a real bed and not a Pack 'n Play.

Pictures of the finished rooms tomorrow!

Friday, February 18, 2011

House Renovation, Day 5


Mr. D and the boys are just about done.  They worked really hard this whole week to get the place ready for Zak Brown to work on the floors. 

I stopped in at lunch each day this week to check on their progress and see if they needed me to answer any questions or make any final choices.  I’ve noticed that they guys get drive-through lunch each day and have a picnic in one of the rooms.  On Tuesday I told them to sit at our table to have a more proper meal.  Mr. D. declined saying that this is what they do when they are on the job.  No matter how much I pushed they had their picnic in the bedroom.

I know that I’ve gotten sick of eating out all week since the kitchen is a dusty disaster and cooking food in that does not sound very good.  No matter how much I wipe down the counters, the dust remains.  I decided to give Mr. D and the boys a home-cooked meal for lunch today.  Last night I put together our favorite Chicken Tortilla Soup in the crock pot.  When I got up this morning, voila, lunch.  Mr. D. was happy that they would not have to go out today.  I warmed up some soup at lunchtime and made them sit at our table.   Maybe those brownie points will put a spring in their step to work faster!

At lunchtime, one of the boys was plastering the corner bead around the former pocket door opening.  Although it’s not the size I wanted, it is going to be a great addition to the flow of the house.  Mr. D. and his other son were fitting the new doors on all the rooms down the hall. 

Did I already tell you about the doors?  Since we needed a new on for the new bedroom, we figured we’d go all out and make all the doors down the hall match.

Zak Brown was getting ready to stain the kids’ rooms.  I already picked the color for the final stain yesterday and he had G's floor already stained.  It looks amazing!

You can see the awesome 6-panel doors that need some stain once the weather gets nicer.

As of this point we had not decided if we were going to stay at home tonight or go to a hotel.  This depended on how much progress Zak made on the floors.  He said that he would be able to stain and put both coats of urethane down so staying in the house was not going to be possible.

Boy was he right!  After work Matt and I zipped home to pack a bag for a few days.  We could only stand being in the house for a few minutes before the fumes became too overwhelming.  We went in and out in shifts until we had, what we thought, was enough to sustain us away from home.

Matt used some of those accumulated hotel points to get us a place just on the other side of the expressway from home.  So any trips back to the house would not take too long.  
Of course Lotso Huggin' Bear had to come, too

Thursday, February 17, 2011

House Renovation, Day 4


Things are flying today.

When I came home for lunch I thought the fire marshal would show up because the house was full of people!  Mr. D and the boys were eating lunch while the electrician was working in G's room, and a clean shaven guy was in M's room.  When I introduced myself to the guy in M's room, he reminded me that we had met the other day.  Guess who it was?!


Zak Brown shaved his beard!  I soooo did not recognize him.  The good thing is the beard has nothing to do with his skills with the floors.  M's room was already sanded and we chose the stain for the floors.  Zak Brown would not get much more done in her room today.  Tomorrow he will sand G's room, stain both kids' rooms, start laying the floor in our bedroom (since the original could not be salvaged), and lay the first layer of urethane.  He'll come back on Saturday morning to lay the second coat.  We can move the kids back into their rooms on Sunday!

M's room at lunchtime today
There is one small additional project that we decided to add since Zak Brown was going to work on the floors.  We have a pocket door in the kitchen that is a ridiculous, annoying toy for the children.  We never use it to block off the kitchen.  Since it was not a load-bearing wall, it has to go!  One wall up, one wall down :)

Pocket door - before
Pocket door - during
Let's call this pocket door the best laid plans.  I wanted the pocket door removed all the way up to the ceiling.  That would make the living room and kitchen seem just a bit bigger.  Since it's a pocket door we figured that the removal would be an easy job.  When Mr. D and the boys opened up the wall they discovered that there was a 4x12 header (I have no idea) that ran from the top of the pocket door all the way across the kitchen.  So my way open passage has turned into a really wide doorway.  I guess it's better than nothing.  However, that puts a wrinkle in my furniture plans for a bookshelf along the wall.  Oh well.

The electrical is another snowball that's brewing.  Our house has a mix of original wiring and new wiring.  We don't trust anything The Hack did plus the original wiring is pretty gnarly, to quote Zak Brown.  We might, might, have the electrician pull all the old wire while he's here.  We'll decide that tomorrow. 

We surely miss G.  We've Skyped with him several nights this week.  It's a hoot to see him get excited to see our faces.  If one of us is missing, he'll ask where we are.  When we pop into the screen he does his trademark, "OOOH, OOOH!"  I hope to get him back from the grandparents tomorrow night or first thing Saturday.  For all the chaos and craziness he brings, it's noise we need him back in our house.

Wednesday, February 16, 2011

Day 3


We have closets!  Mr. D and the boys got them drywalled, taped, and mudded.  Now that we've seen the actual size of the room we are wondering how much of our furniture will actually fit back in.  Of course we worry about where the TV and satellite receiver will go.  In the old room they easily sat on our dresser.  In this room we are not sure where the dresser will go, and if that placement will allow for comfortable watching from bed.

Matt and Mr. D. came up with an ingenious idea for our satellite receiver.  Hang the TV on the wall, and steal a little space from the ceiling of G's closet for a built in shelf to hold the receiver.  Mr. D. will deck it out with a 4-gang outlet so we could possibly put another component in there as well.

The most brilliant thing about it is how he is going to hide the cords.  We did not want the cords to hang down the wall to an outlet.  Mr. D. fashioned a cord chase out of  a length of PVC pipe from the built-in shelf that has an elbow where it comes out of the wall.  Yes, we have a round hole of PVC in the wall, but once the TV is hung you will never see it.  You've got to see it!

M in G's doorway

The ingenious shelf in G's closet.  It will be drywalled off soon

There's the shelf in our room.  It looks weird now, but once it's painted it will blend.  "Oh yeah, you blend."
 The flooring guy, who by the way looks like the lead singer of the Zak Brown Band, will be there in the morning.

He talks like a surfer and isn't sure how gnarly the floors will be under the carpet.  Cross your fingers for quality floors that just need to be sanded and stained so the kids can sleep in their rooms!

Tuesday, February 15, 2011

And We Have A Closet


The flooring guy came by this morning and indicated he could start on Thursday.  Wahoo!  Now the true logistics of how to refinish all the floors in the house begin.  We think we might have them finish the bedrooms so we can move the furniture out of the living room.  We'll see! 

What I do know is that by the end of the day we had a skeleton of closets.


It's a good thing the weather is going to be nice today


Mr. D. and the boys got to work right away this morning.  I'm home with them for a bit to talk to the hardwood floor guy.  They have now cut through the wall for the new doorway.  I guess there is no turning back now, right?



The whole-house fan and the windows are open.  Whoa, baby is there ever some dust flying here.

Monday, February 14, 2011

House Renovation, Day 1


Mr. D. arrived right on time at 8:00.  I had to leave for work but Matt stayed behind to answer any questions Mr. D had.

All day I was awaiting an email or text photo that never came.  I could not stand it!

Finally the following text came in - "It's a mess in here."  Really?  That's all you can share!!  I had to come home and see for myself.  Mr. D and his son were just leaving for the day.

Here's the progress:
Our old closet is gone.  It's been widely known that at least one former owner of this house was a hack when it came to home renovation.  Today we have even more data to support that fact.  When Mr. D was removing the drywall in the closet he jostled the light and a fuse popped.  Mr. D. later found that the wiring was not securely or properly installed in the fixture box and the wires had burned through the electrical tape.  Now it makes sense that the closet light would flicker in and out at any old time.  That was a great fire waiting to happen.
The closet was the white rectangle to the left.  The hole in the ceiling was the fire hazard. 
They removed the carpet and decided that half of the hardwood had to go.  The planks in one of the rooms could not be saved.  The saving grace is that the planks can be used to patch other areas of the house.
There's where our bed used to be
Mr. D. will be back in the morning with his flooring guy to make the plan of attack for the rest of the flooring in the house.

Sunday, February 13, 2011

House Renovation, Step 1


G is safely at Grandma & Grandpa's house for a few days.  Matt and I started moving furniture after returning from our drop off rendezvous.  We got less moved that we had anticipated, but at least our bedroom is empty.  Here are some before and afters



Good bye big bedroom....